LA for flying for bus fly to hide the village for Olympic Plans
In Sparlowing County where the transit lines are strongly exterior for the transfer of people for 2028 Olympic and Paralympius and avoid loss of traffic.
The plan that passes on a 2 billion of the Trump to lease about 5 2,400 dollars to join the network to join the network. But about three years to get open to the end of which the plan is facing a lot of challenges than funding and time.
The federal government has not yet responded to the city’s request. And promises to rent lease fasts to the commitment of the Metro tongue can cause delivery infrastructure and challenges. Drivers will also be trained within the framework of government regulations and will provide home through the game.
“Three years may look like a lot of time for us, but at the time of the municipality, three years are like an eye-blink. It’s our greatest challenge.” The city of Watan city, Doctor Romans, in a recent UCLA transfer forum. “Father’s time comes.”
Games will be divided into the area in the area, including the Shantta Beach and Hand-Digetout County in Asma Bible. The parties and function meetings will occur in the city. Since it and many places are not directly accessed by the train, the city leaders for “transaction coast boss” is the best messages for “car free Olympic”. “
The bus system will be the village pressure key for the first “transit”.
(Gabrelle Engale – Jones / Hand parts
Outside the bus system, most transfer projects in work was part of the expansion of the expansion, which will provide a replacement of driving to the airport. There are also suggestions for use of water taxi from water taxi, where the multiple events are conducted, to provide a replacement of Venis Thomas and Long Coach.
The big question is whether sufficient people in the automated enfac country will be ready to take public transit. Leaders believe that the tourists may benefit from the system, and hope that many angels will also do.
“All our global visitors to spray the public transportation – The director of the County Supervisor and the Metro Board of the Person’s Olympics and the Total Board of Paris. So I will be a good experience in the bus or training that can be better experience than Olympics for the Olympic Side. “
Los Angeles have warned of large traffic jams before the 194 Olympics. Advised Peshigarian Persensus Pieceers to take the city to leave and rental leaves and many assumptions to visitors. After the 1980s of Times Times Report, the 1980s will be burned more than 2080, so the city will shut down the heat temperature.
Capic Games, We have warned of the month of my private Olympic Olympic Olympics Olympic Gard, which is so bad that people should be forced to leave their vehicles in free ways.
During the trap in the afternoon of the night in the summer Olympic
(Michael MonteFeeferems / Michael OCHES through Gate Photos)
At the end, disaster was avoided. He was today with today – Olympics and Emirates and the elders and the elders and the elders were prevented the country’s olympics and leaders across the country.
Traffic was due to management of management, if the people have left the area of ​​the people and subsidity over the way to the persons and especially due to serious predictions of the completed gridak.
But the fast, the population of the ears has grown to about 807 million in 1984, and the area is expected to expect millions of millions in the last game. Guess for the total number of donors is still ambiguous, but the planner predicted that Million millions of more ticket husks than 1984 olymps.
“There’s a mountain and if you move an older, it’s too hard in three years,” It’s too hard in three years. “” Buses are so hard to get, but all these policies and regulatory changes may be hard. “
Metro received the promises of leasing for about 650 buses so far. It said that it would take time to get bus drivers, tested, tested, tested, tested, tested, tested, tested, tested, tested, tested, tested, tested, tested, tested, tested, tested, tested, tested The had been tested, tested, tested, freedom is trained and verified to run public transit in the government. An extraditional 6,000 estimate of the estimated 6,000 estimate will be required to drive people in the game. Matro said the drivers are expected to be given the buses through lending the transit agencies.
In the latest state budget proposal, $ 17.6 millioning designates and Paralympics planning, including by the roads for traveles, mediagetages, officials, officials, International Olympics Committee, spectators and workers. But the city and Metro leaders have raised concerns about funding gaps, especially with the funding of the extra buses and institution, as it will be with the budget for the budget.
The cycling rickshaw driver, transmitting the dic muscular capous, travelers, in the Los Angeles on the Las Angeles in the Los Angeles in 1984.
(Michael MonteFeeferems / Michael OCHES through Gate Photos)
Olympic’s Plannd should be successful on the other hand.
“La la still invested here in infrastructure infrastructure in infrastructure and more than that in 204,” Syrin of LA28 Chase Case Said after a three-day trip from the Olympic International Committee.
“We feel very confident that it will be a different version of his success that we had in terms of their transport and experience.”
Times Employment Author Youth Azighan participated in this report.
Post Comment